Skip to content

97.2kWp Bhulke Solar PV Water Lifting Project at Arghakhanchi District

We are nearing our completion of the 97.2kWp Solar PV water lifting project at Bhulke, Arghakhanchi. This project was undertaken under the Federal Water Supply and Sewerage Management Project, Arghakhanchi. 3 stages of water lifting is being undertaken for this project. A total of 3 nos of submersible pumpsets sized 50HP, 25HP and 25HP is being operated by 48.6kWp, 24.3kWp and 24.3kWp Solar PV array respectively. The 50HP pumpset would be lifting at an average of 200m3/day of water at a height of 195m, the 25HP would be lifting at an average of 100m3/day of water at a height of 180m and the 25HP would be lifting at an average of 80m3/day of water at a height of 220m. Hence an average total of 380m3/day of water is being lifted using this scheme.