Skip to content

Solar Water Pumping Project at Gulmi – Bhalukhola RSDWP and Rawkhola RSDWP

We signed an agreement with Alternative Energy Promotion Centre on 27th June 2024 for the Supply, Delivery, Installation, Testing and commissioning of two Solar Water Pumping Projects in Chandrakot RM-2 and Gulmi Durbar RM-1.

A 2 stage water lifting of 242 and 219 metres with an average daily discharge of 60,000 LPD at Bhalukhola and a 2 stage water lifting of 265 and 233 metres with an average daily discharge of 80,000 LPD at Rawkhola was undertaken at both of these sites.

This project was undertaken in joint collaboration with Centre for Rural Technology (CRT/N) and Wine to Water Nepal.