46.17kWp Solar PV array will now power the 45HP water pump in Tumlingtar, Sankhuwasabha District. The current system is using 3 phase mains to power these water pumps. With the introduction of solar PV, annual average savings of almost NRs 11,00,000 can be realised. This project has been successfully tested and commissioned.